
SPECIALIST SERVICES
Fire fighting installation with clear design boundaries.
Fire fighting installation work for industrial plants and buildings, organised around approved designs, defined responsibilities and the project’s specified inspection and testing requirements.
Typical work packages.
The final package follows the approved project information and agreed scope.
Distribution systems
Hydrant, sprinkler and associated piping installation where included in the approved package. Routes, supports, access and interfaces are coordinated with the other building or plant services.
Equipment interfaces
Installation coordination for pumps, tanks, valves and connected equipment within the agreed scope. Electrical, controls, civil and specialist responsibilities are made explicit.
Existing-system work
Modifications and maintenance work planned with the site operator around system availability, authorised isolations, access and reinstatement requirements.
Plan the interfaces. Record the completion.
Confirm the approved drawings, equipment schedules, work boundaries, authority or specialist responsibilities, access and other-service interfaces. Design approval and final acceptance responsibilities must be identified for the project.
Inspection, testing and handover
Coordinate the specified inspections, testing and completion records. Acceptance criteria, witness requirements, specialist attendance and handover responsibilities are agreed in advance.
Useful enquiry information
Send the location, approved drawings, system and equipment schedule, BOQ, new-build or modification scope, testing requirements, interfaces and intended programme.
Connected services and useful guidance.
Explore related work packages and preparation guidance.